This post is very sudden and I will make a proper introduction of this blog later, hopefully. Today was my first day in TNBR. There are 2 other trainees from UNITEN, Ms Faten and Mr Shah. 1 is assigned to the transmission department and 1 to the distribution department, myself included. The supervisor is Dr Basri, whose research field is on cables and that is what I will be doing in the next 3 months.
As you can see above, I was placed in the High Voltage Diagnostic Laboratory. It is a big room consisting of several rooms for researchers, an area of cubicles, and several cable testing rooms. I learned quite a few, lot of things actually about conductors, insulators, and how the informations measured from cables can help us in determining the problem of the cable. Wait what? cables?
Those are cables. A variation of cables that is used or being used in our country. I will tell you about the cables in later posts.
No comments:
Post a Comment